Description: |
This project consisted of the design, build and installation of three sections of process and one section of stair tower on the multi-effect module, supply and installation of a 100,000 gallons and 250,000 gallons tank with the required facilities and utilities to integrate the system. Aireko performed all electrical interconnections between modules, civil, structural and architectural work, Instrumentation, Mechanical equipment installation and the installation of the evaporator modules supplied by Lilly del Caribe.
The project was completed in 8 months. |